We loaded and moved the extra furniture from the Dallas building to the storage unit in Marietta. (Completed)
Then we went to the Cunningham building loaded and moved the extra furniture into the storage unit in Marietta. (completed)
From the Marietta storage unit I drove to Acworth to complete the final work orders.
I installed the rubber trim in the custodial closet with glue. (completed)
Checked the fire alarm control system and it was normal and was working good. (completed)
Repaired the wood trim in the hall by the serving area. (completed)
Adjusted the strike plate and closer on the 2 right double doors on the side of the building. (completed)
Worked 8 hours
Jeff
Chris and I met in Dallas to load and move the extra furniture to the storage unit in Marietta. (Completed)
The extra furniture in Cunningham building that was loaded and moved into the storage unit in Marietta. (completed)
Loaded and moved the extra furniture from Dallas and Cunningham into the storage unit in Marietta. (completed)
I installed the rubber trim in the custodial closet in Acworth. (completed)
Checked the fire alarm control system and it was normal and was working good in Acworth. (completed)
Repaired the wood trim in the hall by the serving area in Acworth. (completed)
Adjusted the strike plate and closer on 2 side doors in Acworth. (completed)
No comments:
Post a Comment