FBJ28631 Checked the outside key box and secured it to the wall. I had to remove it from the wall and mark the holes to drill a new hole to anchor it properly to the wall. (completed)
FBJ28761 Used stain remover and scrubbed the door handle to remove the stain off the Bishop's office door. (completed)
FBJ28756 I had to use the tall ladder to move all the track lights in the cultural hall to the 3rd section, furthest away from the chapel. (completed)
Finished installing the cabinet locks in clerks office. I had to measure the drawer to drill the hole for the lock to be installed in the center for it to lock properly. (completed)
Checked all HVAC and thermostats through out the building and all is working properly. (completed)
Worked 8 hours
Jeff
Checked all the HVAC and the thermostats and all worked properly. (completed)
Installed the cabinet locks in the clerks office. (completed)
FBJ28756 Removed all the track lights in cultural hall to the 3rd section. (completed)
FBJ28761 Removed the stain on the door handle. (completed)
FBJ28631 Checked the outside key box and secured it to the wall. (completed)