Tuesday, November 16, 2010

11/16/10 Rome

On Tuesday I went to Rome to perform the following work orders.

FBJ28924 Repaired the outlet underneath the drinking fountain. (completed)

FBJ28821 Tightened all the door handles on the classroom doors through out the building. (completed)

Tightened the screws on the legs on a few tables that were loose and unstable. (completed)

Adjusted the strike plates and closers on a couple of doors for them to shut properly. (completed)

Checked the HVAC systems, outlets and light switches throughout the building and all are working properly. (Completed)

Checked the lights in the chapel and all was working properly, no repairs were needed. (completed)

Checked the sound system and it is working good. (completed)

Stained some wood work in the chapel that had scratches and chips on the wall divider. (completed)

Checked all the plumbing throughout the building and found no problems. (completed)

Worked 8 hours

Jeff







FBJ28924 Repaired the outlet underneath the drinking fountain. (completed)






FBJ28821 Tightened all the door handles on the classroom doors through out the building. (completed)




Tightened the screws on the legs on a few tables. (completed)




Adjusted the strike plates and door closers to shut properly. (completed)





Checked the HVAC systems, outlets and light switches and all are working properly. (Completed)




Checked the lights in the chapel and all was working properly. (completed)



Checked the sound system and it is working good. (completed)




Stained some wood work in the chapel. (completed)