Wednesday, November 17, 2010

11/17/10 Cedartown

On Wednesday I went to Cedartown to perform the following work orders.

FBJ28848 In Primary room - repaired wall around sensor and touched up wall with dry wall patch.
Patched and painted other walls as needed through out the building. Also checked the outlets and light switches in the building and they are all working properly. (completed)

FBJ28931 The toilet in the men's handicap restroom had a leak and I had to tightened the hose on both connections to stop it from leaking. (completed)

Checked the fans in bathrooms. The women's fan in the restroom had a bad switch and I had to install a new one. (completed)
The fan in the men's restroom and had a loose connection on the motor and was repaired and is now working. (completed)

Repaired the wood work on a few doors in the hallway with stain that had scratches and chips. (completed)

The carpet was torn in the cultural hall and took a picture to report it. (not completed)

Worked 8 hours.

Jeff







FBJ28848 Repaired the wall around the sensor and switches in the Primary room and also painted it where needed. (Completed)



FBJ28931 The toilet in the men's handicap restroom had a leak and I had to tightened the hose on both connections to stop it from leaking. (completed)




Checked the women's fan in the restroom, it had a bad switch and I had to install a new one. (completed)




Checked the fan in the men's restroom and had to repair a loose connection on the motor. (completed)




Checked all the lights and they are working properly. (completed)




Repaired the wood work on a few doors in the hallway with stain. (completed)



The carpet was torn in the cultural hall and took a picture to report it. (not completed)