I arrived at 8:00 to let the AT&T person into the church to repair/install the phone lines.
Checked all changing tables in the building and they were all good and tight to the wall.
Checked the thermostat control through out the building and all is working with heat.
FBJ29515 Fogged the outside shed for bugs.
The toilet was steady running in the women's restroom. I had to change the flush valve for it to work stop leaking water in the toilet and now is working properly. Checked all other plumbing through out the building and found no leaks.
All the clocks had the proper times.
All the outlets test good.
Checked all the doors through out the building and adjusted the strike plate as needed to shut properly.
Checked the attic lights and heater, all seems to be working good.
In room 109, the relief society room and the hallways I touched up with paint, there was scratches and tape that pulled the paint off the sheetrock.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all sounds good.
All the lights are working properly in the chapel and in the cultural hall.
All classroom tables were checked and the screws on the legs were tightened as needed.
The men's restroom had a burnt light over the sink and I replaced it with a new bulb.
Worked 8 hours
Jeff
Checked all changing tables in the building and they were all good and tight to the wall.
Checked the thermostat control through out the building and all is working with heat.
FBJ29515 Fogged the outside shed for bugs.
The toilet was steady running in the women's restroom. I had to change the flush valve for it to work stop leaking water in the toilet and now is working properly. Checked all other plumbing through out the building and found no leaks.
All the clocks had the proper times.
All the outlets test good.
Checked all the doors through out the building and adjusted the strike plate as needed to shut properly.
Checked the attic lights and heater, all seems to be working good.
In room 109, the relief society room and the hallways I touched up with paint, there was scratches and tape that pulled the paint off the sheetrock.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all sounds good.
All the lights are working properly in the chapel and in the cultural hall.
All classroom tables were checked and the screws on the legs were tightened as needed.
The men's restroom had a burnt light over the sink and I replaced it with a new bulb.