I repaired the front of the brick wall by the dumpster with a few bricks that was missing.
The speaker in the Primary room was hanging down from the ceiling and I had to push it back in and put a screw to tighten it up back into the ceiling. I painted the screw white that I put into it to match the ceiling tile.
I repaired and reattach the handrail in the font. I had to use a longer screw with a new anchor to anchor it into the wall to repair it.
Checked the classroom tables through out the building and I had to tighten the screws on a few of the legs.
I checked the plumbing in the restrooms through out the building and found no leaks and had to tighten the screws on one of the changing tables to the wall.
I repaired the gutter, the splash guard was off on one side and I put it back on the corner of the gutter, so that should stop the water from running over the gutter into the mulch on the ground. I scattered the mulch back evenly on the ground where the water had came off the roof and made a hole in the ground. I also had to tighten the screws on the downspouts that connects to the outside wall. (completed)
I checked the lights through out the building and found a cracked lens in the light of the relief society room and replaced it with a new glass lens that I found in the custodial closet. The emergency lights and all other lights were working properly.
I checked the appliances in the kitchen area, the stove, refrigerator and microwave and no problems were found.
Lubricated the pulpit control and checked the fuse, satellite and sound system and they all sound good.
When the supplies arrived I loaded them in the back of my truck to deliver to the Atlanta Temple. After arriving at the Temple I had to unload the supplies into Elvidio shop.
worked 8 hours
Jeff
I repaired the front of the brick wall by the dumpster with a few bricks that was missing.
The speaker in the Primary room was hanging down from the ceiling and I had to push it back in and put a screw to tighten it up back into the ceiling.
I repaired and reattach the handrail in the font.
Checked the classroom tables through out the building and I had to tighten the screws on a few of the legs.
The supplies I loaded in the back of my truck to deliver to the Atlanta Temple.
I checked the plumbing in the restrooms through out the building and found no leaks and had to tighten the screws on one of the changing tables to the wall.
I repaired the gutter, the splash guard was off on one side and I put it back on the corner of the gutter, so that should stop the water from running over the gutter into the mulch on the ground. I also had to tighten the screws on the downspouts that connects to the outside wall. (completed)
I checked the lights through out the building and found a cracked lens in the relief society room and replaced it with a new glass lens. The emergency lights and all other lights were working properly.
I checked the appliances in the kitchen area, the stove, refrigerator and microwave and no problems were found.
Lubricated the pulpit control and checked the fuse, satellite and sound system and they all sound good.