Thursday, April 28, 2011

04.28.11 Cedartown

On Thursday I went to Cedartown to do the following work orders and maintenance in the building.

I had to take the cover off of the exhaust fan in the men's restroom and found a loose connection on the plug in, that I had to repair for the motor to work properly.

The nob on the timer for the exhaust fan in the women's restroom was stripped and I had to put a new nob to repair it. The fan is now working properly.

FBJ29669 I had to replace two emergency light wall packs in the chapel. (completed)

I checked the thermostat controls through out the building and they are working properly blowing cool air.

Looked and Listened to the outside units for any abnormal conditions and they seemed to be performing properly with cool air.

I repaired one of the classroom table legs with new screws in the cultural hall that was broken. I checked all other tables and tighten the legs as needed that were loose.

FBJ28813 The curb needs to be grounded down level with the sidewalk.

FBJ29802 There were no problems found with the versamatic vacuum cleaner. When using the vacuum cleaner attachments the beater bar stops turning and once you put the attachment hose back into the vacuum cleaner the beater bars will start turning again. (completed)

I checked the emergency ballasts in the hallway and is working properly.

I checked the plumbing in the restrooms in the building and no leaks were found.

FBJ29801 I had to adjust the tension screw on the side of the microphone to stop it from siding down. (completed)

Lubricated the pulpit control and checked the satellite, fuse and sound system, all is working properly.

Worked 8 hours

Jeff







I had to take the cover off of the exhaust fan in the men's restroom and found a loose connection on the plug in that I had to repair for the motor to work properly.





The nob on the timer for the exhaust fan in the women's restroom was stripped and I had to put a new nob to repair it.







FBJ29669 I had to replace two emergency light wall packs in the chapel. (completed)



I checked the thermostat controls through out the building and they are working properly blowing cool air.




Listened to the outside units for any abnormal conditions and they seemed to be performing properly with cool air.





I repaired one of the classroom table legs with new screws in the cultural hall that was broken.





FBJ28813 The curb needs to be grounded down level with the sidewalk.



FBJ29802 There were no problems found with the versamatic vacuum cleaner. When using the vacuum cleaner attachments the beater bar stops turning and once you put the attachment hose back into the vacuum cleaner the beater bars will start turning again. (completed)




I checked the emergency ballasts in the hallway and is working properly.





I checked the plumbing in the restrooms in the building and no leaks were found.




FBJ29801 I had to adjust the tension screw on the side of the microphone to stop it from siding down. (completed)






Lubricated the pulpit control and checked the satellite, fuse and sound system, all is working properly.

No comments:

Post a Comment