I checked the thermostat controls and they are working properly with cool air.
The speaker in the primary room was loose and I tightened the screws and pushed it back in place.
I loaded the supplies into my truck that was delivered to the Roswell building and I brought them to the Atlanta Temple. We unloaded all the supplies at the Temple store. We also cut up two big crates and threw them in the dumpster.
I checked the lights and the emergency lights through out the building and I had change two of the spot light bulbs in the cultural hall. I had to use the long extension pole to be able to reach the bulbs to change them.
I had to adjust the strike plate on a couple of doors for them to shut tight and all others are opening and closing properly.
I also tightened and lubricated the hinges on all the doors in the building as needed.
Checked all the clocks in the building and they all had the proper time.
I checked the outlets in the building and had to tighten the outlet and the covers as needed.
I touched up some woodwork with stain on the base boards in the back of the hallway that had scratches and chips. I was able to stain about half of the baseboards before the truck with the supplies arrived.
Went thru the classrooms and tighten the screws on the legs of the tables as needed.
The changing tables were good and tight to the wall.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.
Worked 8 hours
Jeff
I checked the thermostat controls and they are working properly with cool air.
The speaker in the primary room was loose and I tightened the screws and pushed it back in place.
I loaded the supplies into my truck that was delivered to the Roswell building and I brought them to the Atlanta Temple.
I checked the lights and the emergency lights through out the building and I had change two of the spot light bulbs in the cultural hall.
I had to adjust the strike plate on a couple of doors for them to shut tight and all others are opening and closing properly.
I tightened and lubricated the hinges on all the doors in the building as needed.
Checked all the clocks in the building and they all had the proper time.
I checked the outlets in the building and had to tighten the outlet and the covers as needed.
I touched up some woodwork with stain on the base boards in the back of the hallway that had scratches and chips.
Went thru the classrooms and tighten the screws on the legs of the tables as needed.
The changing tables were good and tight to the wall.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.