07.06.11 Dallas

On Wednesday I went to Dallas to do the following work orders and maintenance work in the building.

FBJ30034 I wasn't able to find the same kind of globe that was missing from the light on the Ensign bishop's office on the side of the building, so I had to replace both of them in the foyer. (completed)

FBJ29831 The parking lot issues have all been repaired, the cracks in the surface, bumpers and the stripes painted and it all looks good. (completed)

I checked the thermostat controls and they are working properly with cool air through out the building.

In the classroom next to the Ensign bishop's office on the corner there was a loose wire on the ballast. I had to tighten it and now the lights are both working.

FBJ29800 The two parking stops in the handicap parking spaces have been replaced and it looks good. (completed)

I checked the outlets through out the building and they were all working properly.

FBJ32081 The light in the storage room was not working and I had to change the ballast.

FBJ30331 The A/C in the Branch President's Office is leaking again.

The lights in the chapel and cultural hall are all working properly, no burnt bulbs were found.

I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.

The won doors separating the chapel and cultural hall were opening and closing properly.

I checked the appliances in the kitchen and they were all working properly and no leaks were found with the plumbing.

The plumbing in the women's and men's restrooms were working properly and no leaks were found.

Worked 8 hours,

Jeff









FBJ30034 I wasn't able to find the same kind of globe for the light that was missing, so I had to replace both of them on the Ensign bishop's side of the building in the foyer. (completed)









FBJ29831 The parking lot issues have all been repaired and looks good. (completed)




I checked the thermostat controls and they are working properly with cool air through out the building.






In the classroom next to the Ensign bishop's office on the corner there was a loose wire on the ballast. I had to tighten it and now they both are working.





FBJ29800 The two parking stops in the handicap parking spaces have been replaced and look good. (completed)






I checked the outlets through out the building and they were all working properly.






FBJ32081 The light in the storage room was not working and I had to change the ballast.





FBJ30331 The A/C in the Branch President's Office is leaking again.





The lights in the chapel and cultural hall are all working properly, no burnt bulbs were found.






I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.






The won doors separating the chapel and cultural hall were opening and closing properly.







I checked the appliances in the kitchen and they were all working properly.






The plumbing in the women's and men's restrooms were working properly and no leaks were found.