FBJ31793 I finished putting the locks on the A/C units with a combination lock and a couple I had to use chains around the post and gate. (completed)
I had to adjust the strike plate on the door for it to shut and open properly. I checked all other exterior doors through out the building and they are shutting good and tight.
FBJ32281 I had to adjust the cylinder on the chapel door by the rostrum several times for it to shut properly. But I believe the cylinder may be getting weak and not sure how long it will last. I may have to put another cylinder later if it happens again. (completed)
FBJ32338
FBJ31974
I checked the HVAC problems in rooms 102 and 103, it definitely needs to be serviced. There is no cool air blowing out of the vents and these 2 work order numbers seem to be for the same A/C problems. I noticed on another work order Mike was called for other areas that had HVAC problems......would he be the person to call to service these also?
FBJ23179 The A/C in the Library and the 2 classroom next to the electrical panel by the main entrance is still not blowing cold air. The whole side of the building seems to have major A/C problems with not keeping the building cool. Mike needs to be called to service them.
I checked the baby changing tables and they are secured to the walls.
FBJ32279 I finished scrapping the old frost off the window in the mothers room. I did not find any frost in the shed or closets, so I will have to get some and spray the new frost later.
FBJ32275 I touched up the font wall with some sheetrock mud and repainted it. (completed)
The chapel and cultural lights were all working properly.
There was a light in the hall that was not working. I had to change one ballast in the light and now it is working properly.
FBJ32276 I scraped the rust off the partition in the men's restroom that has the rust on the bottom. I had to sand it smooth and then I painted it with gray paint. Sorry I had gotten distracted and forgot to take an after picture.
FBJ30387 I checked to see if the A/C was working in the Stake Office and the air wasn't blowing as cold as it should be in some of the rooms.
FBJ32286 I had to change the ballast in the light in the room that the light was making noise that was in the Stake Office. (completed)
Worked 8 hours,
Jeff
FBJ31793 I finished putting the locks on the A/C units with a combination lock and a couple I had to use chains around the post and gate. (completed)
I had to adjust the strike plate on the door for it to shut and open properly. I checked all other exterior doors through out the building and they are shutting good and tight.
FBJ32281 I had to adjust the cylinder on the chapel door by the rostrum several times for it to shut properly. But I believe the cylinder may be getting weak and not sure how long it will last. I may have to put another cylinder later if it happens again. (completed)
FBJ32338
FBJ31974
I checked the HVAC problems in rooms 102 and 103, it definitely needs to be serviced. There is no cool air blowing out of the vents and these 2 work order numbers seem to be for the same A/C problems. I noticed on another work order Mike was called for other areas that had HVAC problems......would he be the person to call to service these also?
FBJ23179 The A/C in the Library and the 2 classroom next to the electrical panel by the main entrance is still not blowing cold air. The whole side of the building seems to have major A/C problems with not keeping the building cool. Mike needs to be called to service them.
I checked the baby changing tables and they are secured to the walls.
FBJ32279 I finished scrapping the old frost off the window in the mothers room. I did not find any frost in the shed or closets, so I will have to get some and spray the new frost later.
FBJ32275 I touched up the font wall with some sheetrock mud and repainted it. (completed)
The chapel and cultural lights were all working properly.
There was a light in the hall that was not working. I had to change one ballast in the light and now it is working properly.
FBJ32276 This is the partition in the men's restroom that has the rust on the bottom. I scraped the rust off and had to sand it smooth, then I painted it with gray paint. Sorry I had gotten distracted and forgot to take an after picture.
FBJ30387 I checked to see if the A/C was working in the Stake Office and the air wasn't blowing as cold as it should be in some of the rooms.
FBJ32286 I had to change the ballast in the light in the room that the light was making noise that was in the Stake Office. (completed)