FBJ32233 The landscapers were there mowing the grass, trimming the bushes and pulling weeds around the church.
FBJ32231 I washed, caulked and painted the 4 columns on the side of the church. I had to use paper towels for the columns to dry quicker. I had to use the 6 foot ladder to paint the top of the columns. (completed)
While waiting for the columns to dry completely before the caulking could be done I had taken a few pictures of the church to show how the exterior of the building still is looking good.
FBJ32230 I repaired the bubbles on the sisal in the cultural hall. (completed)
Worked 7 hours,
Jeff
FBJ32233 The landscapers were there trimming the bushes and pulling weeds around the church.
FBJ32231 I washed, caulked and painted the 4 columns on the side of the church. I had to use the 6 foot ladder to paint the top of the columns. (completed)
While waiting for the columns to dry I had taken a few pictures of the church to show how the exterior of the building is looking good.
FBJ32230 I repaired the bubbles in the sisal in the cultural hall. (completed)
No comments:
Post a Comment