On Monday I went to the Acworth Building to do the following work orders and maintenance work.

I had to tighten the screws to the wall of the baby changing table to be secured.

The lights in the attic are working properly.

FBJ32121 I repaired the sensor that was torn down by the exterior door by the transformer. I had to put a self tapping screw and screw it back into the soffit. (completed)
FBJ31797 This work order with the pipe, hole in the soffit is the same as the work order above FBJ32121. (completed)

The won doors are opening and closing properly with no problem.

The chapel and cultural lights were all working properly.

I lubricated the pulpit control and checked the satellite, fuse and sound system and they all sound good.

FBJ32120 The room 106 and 107 was painted that had mud marks on the tiles. Sorry, but I forgot to take an after pictures...but it does look good. (completed)

FBJ32122 I touched up with paint in room 116 and 102. The paint is still wet, it will match the same color once it is dry. (completed)

FBJ32125 I have repaired the cracks in the upper chapel walls with joint compound. (completed)

FBJ32126 I have replaced the damaged ceiling tiles in the hallways. (Completed)

FBJ32199 I also checked on the gym floor and it seemed to be okay with my work shoes. I did not come across any area that was slick, it seems to be safe to me. (completed)

Worked 8 Hours,

Jeff








I had to tighten the screws to the wall of the baby changing table to be secured.





The lights in the attic are working properly.





FBJ32121 I repaired the sensor that was torn down by the exterior door by the transformer. I had to put a self tapping screw and screw it back into the soffit. (completed)






The won doors are opening and closing properly with no problem.







The chapel and cultural lights were all working properly.






I lubricated the pulpit control and checked the satellite, fuse and sound system and they all sound good.






FBJ32120 This is the picture of room 106 and 107 before I painted the mud marks that are on the tiles. Sorry, but I forgot to take an after pictures...but it does look good. (completed)







FBJ32122 I touched up with paint in room 116 and 102. The paint is still wet, it will match the same color once it is dry. (completed)









FBJ32125 I have repaired the cracks in the upper chapel walls with joint compound. (completed)















FBJ32126 I have replaced the damaged ceiling tiles in the hallways. (Completed)