FBJ32178 I picked up the hymn number board from Douglasville to install in the Rome building tomorrow, but it was damaged. I noticed the damage when I was in Cedartown and reported it to Ms. Mary. She said that Debbie will pick it up from there and order a new one.
Buchanan Below:
The exterior lights on the building and the parking lot lights are working properly. There was a switch in the attic that was turned off and I turned it back on.
I checked the plumbing in the women's and men's restrooms and no leaks were found. All toilets flushed properly.
I checked the thermostat control in the cultural hall and it was set at 73 degrees and it was working properly blowing cold air.
I tightened up the outlets through out the building as needed in Buchanan.
I checked and tightened the screws on a few of the legs to the classroom tables as needed.
I had to adjust the strike plate on the door for it to shut tight. All other exterior doors were working properly.
I checked all the baby changing table and had to tighten one of the screws for it to be secured to the wall.
Cedartown below:
FBJ32213 The hole that I patched in the font area a couple of weeks ago needed to be painted. It has been done. (completed)
FBJ32207 The door to room M101 that was hard to close has been repaired. The key I had to use was really hard to open the door, but I was able to get it open and tighten the threshold so it is not rubbing on the bottom of the door anymore. I would suggest that a new key needs to be made. (completed)
I checked the plumbing in the restrooms through out the building and no leaks were found. I flushed the toilets and everything was working properly.
FBJ32377 The kitchen door latch had a spring missing. I had to put the little spring back into place on the medal prong that was causing it not to release. Now the door is working properly. (completed)
FBJ32211 I replaced the ceiling tiles in the clerk's office and the primary room that was damaged.
Worked 8 hours,
Jeff
FBJ32178 I picked up the hymn number board from Douglasville to install in the Rome building, but it was damaged. I noticed the damage when I was in Cedartown and reported it to Ms. Mary. She said that Debbie will pick it up from there and order a new one.
Buchanan Below:
The exterior lights on the building and the parking lot lights are working properly. There was a switch in the attic that was turned off and I turned it back on.
I checked the plumbing in the women's and men's restrooms and no leaks were found. All toilets flushed properly.
I checked the thermostat control in the cultural hall and it was set at 73 degrees and it was working properly blowing cold air.
I tightened up the outlets through out the building as needed in Buchanan.
I checked and tightened the screws on a few of the legs to the classroom tables as needed.
I had to adjust the strike plate on the door for it to shut tight. All other exterior doors were working properly.
I checked all the baby changing table and had to tighten one of the screws for it to be secured to the wall.
Cedartown work below:
FBJ32213 The hole that I patched in the font area a couple of weeks ago needed to be painted. It has been done. (completed)
FBJ32207 The door to room M101 that was hard to close has been repaired. The key I had to use was really hard to open the door, but I was able to get it open and tighten the threshold so it is not rubbing on the bottom of the door anymore. I would suggest that a new key needs to be made. (completed)
I checked the plumbing in the restrooms through out the building and no leaks were found. I flushed the toilets and everything was working properly.
FBJ32377 The kitchen door latch had a spring missing. I had to put the little spring back into place on the medal prong that was causing it not to release. Now the door is working properly. (completed)
Primary Room
Clerks Office
FBJ32211 I replaced the ceiling tiles in the clerk's office and the primary room that was damaged.