On Monday I went to Cartersville to do the following work order at the building.

When I arrived at the building I had to get the color of the paint that was needed to paint the exterior hand rails. Then I went to Sherman Williams to purchase two gallons of paint and a paint brush.

FBJ32283 I painted several of the hand rails that had scratches, chips and the paint that was peeling off around the steps of the church. I had to scrape and clean the rails and wipe them down with a rag before painting. My plans are to go back tomorrow and finish the job.

There was a few spots on the side door and gate that was discolored that I touched up with paint.

Worked 8 hours,

Jeff























FBJ32283 I painted several of the hand rails that had scratches, chips and the paint that was peeling off. I had to scrape and clean the rails wipe them down with a rag before painting.

I noticed that was a few spots discolored on the side door and gate, so I touched them up with paint.