FBJ32283 I brought my shears and cut back on the tree limbs on both sides of the building to have enough room to be able to paint the rest of the hand rails. I once again had to scrape and clean the rails and wipe them down where the paint was peeling, with a rag before painting. I also cleaned up the mess from the limbs and threw them in the dumpster. (completed)
The lights in the chapel and cultural hall were all lit up, no problems found.
Worked 8 hours,
Jeff
FBJ32283 I brought my shears and cut back on the tree limbs on both sides of the building to have enough room to be able to paint the rest of the hand rails. I once again had to scrape and clean the rails and wipe them down where the paint was peeling, with a rag before painting. (completed)
The lights in the chapel and cultural hall were all lit up, no problems found.
No comments:
Post a Comment