FBJ32224 I repaired the inside of the door, near the handle in the room 115 that had gouges and chips on it. I also touched up the woodwork with stain on the other doors. (completed)
FBJ32225 I installed the label K and L on the young women cabinet doors. (completed)
FBJ32401 I had to take the handle apart to get to the thumb turn knob on the left door near the Millcreek's office. The screw on the backside was loose and I had to tighten the jam nut and put it back together. (Completed)
FBJ32223 I had to put joint compound, sand and paint around the light switch and cover in room 115. (completed)
FBJ32219 The corner was cracked on the trey ceiling in the RS room over the piano and I had to repair it with joint compound and sand it. (completed)
The thermostat controls were all working properly through out the building blowing cold air.
The baby changing tables were all good and tightly secured to the walls.
I checked the plumbing and flushed the toilets in the women's and men's restroom, no leaks were found and all is working properly.
The won doors through out the building are opening and closing properly.
The appliances and plumbing in the kitchen is all working properly and no leaks were found.
The lights in the chapel and cultural hall are all lit up and working properly.
I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all sound good.
FBJ30331 I ran the A/C in the Branch president's office most of the day and it did not leak any water. It seems to be running properly. Mike must have repaired it. (completed)
Worked 8 hours,
Jeff
FBJ32224 I repaired the inside of the door, near the handle in the room 115 that had gouges and chips on it. I also touched up with stain on the other doors. (completed)
FBJ32225 I installed the label K and L on the young women cabinet doors. (completed)
FBJ32401 I had to take the handle apart to get to the thumb turn knob. The screw on the backside was loose and I had to tighten the jam nut and put it back together. (Completed)
FBJ32223 I had to put joint compound, sand and paint around the light switch and cover in room 115. (completed)
FBJ32219 The corner was cracked on the trey ceiling and I had to repair it with joint compound and sand it. (completed)
The thermostat controls were all working properly through out the building blowing cold air.
The baby changing tables were all good and tightly secured to the walls.
I checked the plumbing and flushed the toilets in the women's and men's restroom, no leaks were found and all is working properly.
The won doors through out the building are opening and closing properly.
The appliances and plumbing in the kitchen is all working properly and no leaks were found.
The lights in the chapel and cultural hall are all lit up and working properly.
I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, all sound good.