FBJ30188 The top of the maple tree that snapped from the storm had been cut in very large chunks. I had to cut it in smaller pieces so I would be able to move it in the back of the woods. (completed)
The clock in the bishop's office needed a new battery, so I replaced it with one. I changed the battery in the clock in the chapel, but it still is not working. I think a new clock may need to be ordered.
FBJ30077 I took a picture of the new units that were replaced from the ones that were stolen a couple of weeks ago. (completed)
I heard the water running from the toilet in the women's restroom. I had to change the flush valve plunger and it is working properly as well as the other toilets in the building. I also checked all other the plumbing and no leaks were found.
I checked and tested the outlets in the building and all are working properly.
I had to adjust the strike plate on the door for it to shut good and tight, all others are working properly.
The changing tables were all good and tight secured to the wall.
FBJ30064 Two new units were replaced and the nursery now is working with cold air. I also checked the thermostat controls through out the rest of the building and they all are working properly with cool air.
The lights in the cultural hall and chapel were all lit and properly working.
Lubricated the pulpit control and checked the fuse, satellite and sound system and they sound good.
FBJ13619 I noticed the piano cover still has not been received in the chapel.
The classroom tables legs have been checked and tightened as needed through out the building.
The handle on one of the stoves was very loose and I had to tighten it back to secure it to the door. The refrigerator and microwave was working properly.
I checked the plumbing in the Stake Office and found no leaks and everything was working properly.
The lights in the Stake Office were all lit and working properly.
Worked 8 hours,
Jeff
FBJ30188 The top of the maple tree that snapped from the storm had been cut in very large chunks. I had to cut it in smaller pieces so I would be able to move it in the back of the woods. (completed)
The clock in the bishop's office needed a new battery, so I replaced it with one.
FBJ30077 Here is the new units that were replaced from the ones that were stolen a couple of weeks ago. (completed)
I heard the water running from the toilet in the women's restroom. I had to change the flush valve plunger and it is working properly as well as the other toilets in the building.
I checked and tested the outlets in the building and all are working properly.
I had to adjust the strike plate on the door for it to shut good and tight, all others are working properly.
The changing tables were all good and tight secured to the wall.
FBJ30064 Two new units were put and the nursery now is working with cold air. I also checked the thermostat controls through out the rest of the building and they all are working properly with cool air.
The lights in the cultural hall and chapel were all lit and properly working.
Lubricated the pulpit control and checked the fuse, satellite and sound system and they sound good.
FBJ13619 I noticed the piano cover still has not been received in the chapel.
The classroom tables legs have been checked and tightened as needed through out the building.
The handle on one of the stoves was very loose and I had to tighten it back to secure it to the door. The refrigerator and microwave was working properly.
I checked the plumbing in the Stake Office and found no leaks and everything was working properly.
The lights in the Stake Office were all lit and working properly.