Wednesday, June 29, 2011

06.29.11 Acworth

On Wednesday I went to Acworth to do the following work orders and maintenance in the building.

FBJ32123 The door 115 had a hole in it and it was repaired and patched. (completed)

FBJ32119 The door stop in the old Bishop's office was loose and I had to tighten it up and later I may have to replace it with a different type of doorstop. The hole is waddled out and it will last for a little while. (completed)

FBJ32126 I had to spray the ceiling tiles that was gouged and others that were scrapped and chipped with touch up ceiling paint in the hallways. (completed)

FBJ32119 The sisal was unglued in the old Bishop's office in the corner. I used some adhesive glue to spray in back of the sisal for it to stick back on the wall. (completed)

I tightened screws on the baby changing tables as needed to secure them to the walls.

I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.

I checked the chapel and the cultural hall lights and they were all lit up and no problems were found.

FBJ32124 I touched up the walls with paint by the cultural hall doors, through out the hall way and the classrooms as needed that had scratches and scuff marks. (completed)

Worked 8 hours,

Jeff







FBJ32123 The door 115 had a hole in it and it was repaired and patched. (completed)





FBJ32119 The door stop in the old Bishop's office was loose and I had to tighten it up. The hole is waddled out and it will last for a little while. (completed)










FBJ32126 I had to spray the ceiling tiles that was gouged and others that were scrapped and chipped with touch up ceiling paint in the hallways. (completed)





FBJ32119 The sisal was unglued in the old Bishop's office in the corner. I used some adhesive glue to spray in back of the sisal for it to stick back on the wall. (completed)





I tightened screws on the baby changing tables as needed to secure them to the walls.






I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounds good.




I checked the chapel lights and they were all lit up and no problems were found.








FBJ32124 I touched up the walls with paint by the cultural hall doors, through out the hall way and the classrooms as needed (completed)