FBJ30191 I repaired the back door that was dragging and wouldn't close. I had to adjust and tighten the hinge with an allen wrench screw. (completed)
FBJ30192 I had to change the ballast next to the Primary room and the light is now working. (completed)
FBJ30329 The south side men's toilet was clogged with substance and toilet paper. The toilet was not refilling and I had to adjust the water level flow valve for it to flush properly. (completed)
The plumbing in the other men's and women's restrooms were all working properly and no leaks were found.
The thermostat controls were working properly with cool air.
FBJ300330 The door that was jammed in the entry way has been repaired and it is closing properly. I had to adjust the bottom hinge and lift it up a little so it wouldn't rub on the door jam. (completed)
I checked the baby changing tables and tightened the screws to the wall as needed.
FBJ30331 I checked the leak on the A/C in the Branch President's office and it seemed to be leaking from the line that was coming back into the building, so I used a little clear caulking around the pipes where someone else had put a lot of white caulking that was coming back into A/C. I ran it for about 2 hours with a dry bucket under it and I didn't notice any condensation leaking.
I checked the won door and they are opening and closing with no problems.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and it sounds good.
I checked the lights in the chapel and cultural hall, there was one spot light burnt in the cultural hall and two spot lights in the chapel that I replaced using the long extension pole.
FBJ30162 I repaired three of the hymnbook holders in the chapel. The screws in the back of the pews were pulled out that held the holder in place, so I had to put new screw holes. There was a couple of screws missing and I had some in my truck that I had to use to screw the other hymnbook holder in place. (completed)
Worked 8 hours,
Jeff
FBJ30191 I repaired the back door that was dragging and wouldn't close. I had to adjust and tighten the hinge with an allen wrench screw. (completed)
FBJ30192 I had to change the ballast next to the Primary room and the light is working. (completed)
FBJ30329 The south side men's toilet was not refilling and I had to adjust the water level flow valve for it to flush properly. (completed)
The plumbing in the other men's and women's restrooms were all working properly and no leaks were found.
The thermostat controls were working properly with cool air.
FBJ300330 The door that was jammed in the entry way has been repaired and it is closing properly. I had to adjust the bottom hinge and lift it up a little so it wouldn't rub on the door jam. (completed)
I checked the baby changing tables and tightened the screws to the wall as needed.
FBJ30331 I checked the leak on the A/C in the Branch President's office and it seemed to be leaking from the line that was coming back into the building, so I used a little clear caulking around the pipes that was coming back into A/C. I ran it for about 2 hours with a dry bucket under it and didn't notice any condensation leaking.
I checked the won door and they are opening and closing with no problems.
Lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and it sounds good.
I checked the lights in the chapel and cultural hall, there was one spot light burnt in the cultural hall and two spot lights in the chapel that I replaced.
FBJ30162 I repaired three of the hymnbook holders in the chapel. The screws in the back of the pews were pulled out that held the holder in place, so I had to put new screw holes. There was a couple of screws missing and I had some in my truck that I had to use to screw the other hymnbook holder in place. (completed)