The thermostat controls were all working properly blowing cool air through out the building.
Ms. Mary would you please order 4 large new key boxes, one for this building and 3 other buildings.
FBJ29836 The lawn in the front of the church that needs to be discuss about the drainage issue. It seems to be doing well and looks good.
FBJ30076 I will give Chris Curby a call after he is back from vacation about replacing the light pole that was damaged from member/truck driver.
FBJ30124 I verify that the irrigation was repaired- Roberts. (completed)
FBJ29928 The dead tree is still in the front lawn.
I checked the baby changing tables and they were good and tight secured to the wall.
I checked the gutters and downspouts and they were all secured tightly and properly to the building.
I checked the interior doors in the building and adjusted the strike plates as needed for the doors to close good and tight.
Lubricated the pulpit control and checked the fuse and sound system, they were working properly, but the satellite was not giving a signal.
The chapel lights were all working properly.
I checked the plumbing in the restrooms for leaks and no problems were found, all was working properly.
I poisoned an ant pile that was located on the side of the parking lot.
I did some woodwork with stain on a few doors that had scratches and chips on the bottom of them.
I checked the kitchen appliances and they were all working properly.
Worked 8 hours,
Jeff
The thermostat controls were all working properly blowing cool air.
Ms. Mary would you please order 4 large new key boxes for the buildings.
FBJ29836 This the lawn in the front of the church that needs discuss about the drainage issue. It seems to be doing well and looks good.
FBJ30076 I will give Chris Curby a call after he is back from vacation about replacing the light pole that was damaged from member/truck driver.
FBJ30124 I verify that the irrigation was repaired- Roberts. (completed)
FBJ29928 The dead tree is still in the front lawn.
I checked the baby changing tables and they were good and tight secured to the wall.
I checked the gutters and downspouts and they were all secured tightly and properly to the building.
I checked the interior doors in the building and adjusted the strike plates as needed for the doors to close good and tight.
Lubricated the pulpit control and checked the fuse and sound system, they were working properly, but the satellite was not giving a signal.
The chapel lights were all working properly.
I checked the plumbing in the restrooms for leaks and no problems were found, all was working properly.
I poisoned an ant pile that was located on the side of the parking lot.
I did some woodwork with stain on a few doors that had scratches and chips on the bottom of them.
I checked the kitchen appliances and they were all working properly.