I had to finish sealing the floor in the material closet. And put two fans on for it to dry.
I trimmed out the room with paint around the pipes, the drain in the floor, duct vents, heaters and base boards in the material closet.
After the trim work was done I rolled the first coat of paint on the floor in the material closet.
I applied the 2nd coat of paint in the first room I started painting last week. Tomorrow I will see if it will need a third coat of paint.
Worked 8 hours,
Jeff
I had to finish sealing the floor in the material closet.
I had to trim out the room with paint around the pipes, the drain in the floor, duct vent, heaters and base boards in the material closet.
After the trim work was done I rolled the first coat of paint on the floor in the material closet.
I applied the 2nd coat of paint in the first room I started painting last week.
No comments: