Wednesday, November 23, 2011

11.23.11 Newnan

On Wednesday I went to Newnan to do the following painting in the building.

In room 109 I had to paint a second coat of paint on the walls. I had to tape the wood trim to trim out around it, using a paint brush. I also used the paint brush to trim around the ceiling, corners, thermostat control, door stop, caulk board, a switch, window and door frame. I had to re mud a few spots on the walls that had holes. Then I had to sand it down and clean it real good with a rag and seal it with primer sealer. Once it was dried I used the roller to finish painting the room.

In room 108 I touched up a few spots on the wall with mud, sand it down, wipe it down real good to clean it and sealed it with primer sealer. I have to let the sealer dry before I can finish painting the room.

Worked 7 hours,

Jeff













In room 109 I had to paint a second coat of paint on the walls. I had to tape the wood trim to trim out around it, using a paint brush. I also used the paint brush to trim around the ceiling, corners, thermostat control, door stop, caulk board, a switch, window and door frame. I had to re mud a few spots on the walls that had holes. Then I had to sand it down and clean it real good with a rag and seal it with primer sealer. Once it was dried I used the roller to finish painting the room.










In room 108 I touched up a few spots on the wall with mud, sand it down, wipe it down real good to clean it and sealed it with primer sealer.