In the sacrament prep room I had to patch some holes in the walls, sand it down and seal it with the primer sealer. Then I prep the room with tape along the base board and trimmed it with the paint brush around the cabinets, door frames, soap dispenser, paper towel holder, a couple of switches and around a 4ft fluorescent light. Then I used the roller to finish painting the walls and the ceiling in the room for it to be completed.
While waiting for the sealer to dry I went to do the work in room 103, after coming back to complete the painting in the sacrament prep room I wasn't able to take pictures of it. The memory card in the camera was full, so I will get another one this weekend and be ready to take pictures on Monday.
In room 103 I finished taping all the wood trim around the room. I had to seal the areas where I had patched yesterday. Then I trimmed it out with a paint brush along the window, two doors, removed the clock and light switch. And before I left I put them back in place. Then I used the roller to finish painting the walls in the room for it to be completed.
worked 8 hours,
Jeff
In the sacrament prep room I had to patch some holes in the walls, sand it down and seal it with the primer sealer. Then I prep the room with tape along the base board and trimmed it with the paint brush around the cabinets, door frames, soap dispenser, paper towel holder, a couple of switches and around a 4ft fluorescent light. Then I used the roller to finish painting the walls and the ceiling in the room for it to be completed.
In room 103 I finished taping all the wood trim around the room. I had to seal the areas where I had patched yesterday. Then I trimmed it out with a paint brush along the window, two doors, removed the clock and light switch. Then I used the roller to finish painting the walls in the room for it to be completed.