On Tuesday I went to Newnan to do some painting in the building.

This morning Jon and I went to Home Depot to purchase some supplies: a small roller, 4 rolls of blue tape, mudding tape, 4 nine inch rollers and a gallon of All Purpose joint compound.

I had to re-mud, sand and seal several areas in the Bishop's office on the Summer Grove Ward side of the building to get it ready to paint a second coat on the walls. I had to tape the wood trim along the walls to trim it out with paint using a paint brush. I had to remove the curtains off the rod to do trim out using a paint brush around the window, door, switches, caulk board, A/c unit and a few pictures.

I had to re-mud, sand and seal several areas in room 111 to get it ready to paint a second coat on the walls. I had to tape the wood trim along the walls to trim it out with paint using a paint brush. I had trim out using a paint brush around the window and door frame, switches, caulk board and a few pictures. I also had to move a toy cabinet to paint behind it on the wall.

Worked 8 hours,

Jeff














I had to re-mud, sand and seal several areas in the Bishop's office on the Summer Grove Ward side of the building to get it ready to paint a second coat on the walls. I had to tape the wood trim along the walls to trim it out with paint using a paint brush. I had to remove the curtains off the rod to do trim out using a paint brush around the window, door, switches, caulk board, A/c unit and a few pictures.










I had to re-mud, sand and seal several areas in room 111 to get it ready to paint a second coat on the walls. I had to tape the wood trim along the walls to trim it out with paint using a paint brush. I had trim out using a paint brush around the window and door frame, switches, caulk board and a few pictures. I also had to move a toy cabinet to paint behind it on the wall.

No comments:

Post a Comment