Monday, November 7, 2011

11.07.11 Newnan

On Monday I went to Newnan to do some painting in the building.

I painted the Bishop Office and had to take a few pictures, the clock and light switch off the walls to paint in that area and hung them back up on the wall after the paint dried.
I took the curtains off the rod, to paint around the window and the wall. After it dried some, I put the curtains back on the rod.

I had to patch a few holes in the walls, sand it down and seal it with primer sealer in room 110 before I started painting. I had to tape the wood trim and trimmed it out with a paint brush all around the corners and edges. Tomorrow I should be able to finish this room.

Worked 8 hours,

Jeff









I took the pictures off the wall to paint in that area and hung them back up on the wall after the paint dried.




I took the curtains off the rod to paint around the window and the wall. After it dried some, I put the curtains back on the rod.







I took the clock, pictures and light switch off the wall to paint and hung them back up after the paint dried.










I had to patch a few holes in the walls, sand it down and seal it with primer sealer in room 110 before I started painting. I had to tape the wood trim and trimmed it out with a paint brush all around the corners and edges. Tomorrow I should be able to finish this room.

No comments:

Post a Comment