Wednesday, November 30, 2011

11.30.11 Fayetteville

On Wednesday I went to Newnan to pick up some supplies and then went to Fayetteville to do the following work orders in the building.

In the Newnan building I had to put new screws that were missing on the cultural hall and chapel doors. I tightened all the screws on the locks and added new screws where needed. I also adjusted the strike plates for the doors for them to shut properly.

I cleaned up the bottom of the stairs in the Fayetteville building and Jon asked me to put all the things that I removed upstairs.

There was a light bulb burnt in the attic and I replaced it with a new bulb.

FBJ33149 The traverse rod was jammed in the chapel shades on the southeast window. I had to get on a ladder and unjam the string that was tangles in the rod to unjam it. I also had to anchor the draw strings to the walls that open and close the curtains. (completed)

The draw string was also hanging loose on the opposite side of the chapel and I had to anchor them down to the wall, so the curtain will open up properly.

FBJ33157 I took the light covers off in the hallways to clean out the bugs and debri. And put the covers back on. I had to use a 6 foot ladder to each the lights. (completed)

I noticed in the hall way a light was out. I had to change the ballast for it to come on and work properly.

worked 8 hours,

Jeff







In the Newnan building I had to put new screws that were missing on the cultural hall and chapel doors. I tightened all the screws on the locks and added new screws where needed. I also adjusted the strike plates for the doors to shut properly.





I cleaned up the bottom of the stairs in the Fayetteviile building and Jon asked me to put all the things that I removed upstairs.






There was a light bulb burnt in the attic and I replaced it with a new bulb.











FBJ33149 The traverse rod was jammed in the chapel shades on the southeast window. I had to get on a ladder and unjam the string that was tangles in the rod to unjam it. I also had to anchor the draw strings to the walls that open and close the curtains.






The draw string was also hanging loose on the opposite side of the chapel and I had to anchor them down to the wall, so the curtain will open up properly.







FBJ33157 I took the light covers off in the hallways to clean out the bugs and debri. And put the covers back on. I had to use a 6 foot ladder to each the lights.





I noticed in the hall way a light was out. I had to change the ballast for it to come on and work properly.