Monday, November 21, 2011

11.21.11 Newnan

On Monday I went to Newnan to do the following painting outside of the building.


I had to file the rust off the gates using a file. Then I had to use a sand block to sand it down smooth and wipe it down with a rag to clean it real good. After that it was ready to be painted. I was able to paint and complete four gates the front and side and one of the back gates of the church. Tomorrow I should be able to have them all completed.

Worked 8 hours,

Jeff
















I had to file the rust off the gates using a file. Then I had to use a sand block to sand it down smooth and wipe it down with a rag to clean it real good. After that it was ready to be painted. I was able to paint and complete four gates.