Before I could start painting room 110 I needed to do some prep work. I had to peel the old paint off the walls that was bubbling and sand it down to smooth the edges. I had to put some joint compound where the paint was peeling and there was a few holes and screws loose around the window frames and in the walls. I had to sand it down before sealing it with the primer sealer. I had to let it dry and I was able to complete the painting in room 110.
I also had to do some prep work in room 109. I had to peel the old paint off the walls that was bubbling and sand it down to smooth the edges. I had to put some joint compound where the paint was peeling and there was a few holes and screws loose around the window frames and in the walls. I had to tighten the screws and re-mud over them. I had to sand it down before sealing it with the primer sealer. After the paint was dry I pulled the tape off and completed painting the walls in room 109.
Worked 8 hours,
Jeff
Before I could start painting room 110 I needed to do some prep work. I had to peel the old paint off the walls that was bubbling and sand it down to smooth the edges. I had to put some joint compound where the paint was peeling and there was a few holes and screws loose around the window frames and in the walls. I had to sand it down before sealing it with the primer sealer. I had to let it dry and I was able to complete the painting in room 110.
I had to do some prep work in room 109. I had to peel the old paint off the walls that was bubbling and sand it down to smooth the edges. I had to put some joint compound where the paint was peeling and there was a few holes and screws loose around the window frames and in the walls. I had to tighten the screws and re-mud over them. I had to sand it down before sealing it with the primer sealer. After the paint was dry I pulled the tape off and completed painting the walls in room 109.
No comments:
Post a Comment