Tuesday, November 22, 2011

11.22.11 Newnan

Tuesday I went to Newnan to finishing painting the gates and room 110 in the building.

I had to file the back gates to get the rust off and smooth it down with the sand block. I wiped and cleaned it real good to get the dust off, so I could paint them. All gates are completed now.

The mother's room had a big crack and was tinged up from where the rocking chair bang against the wall. I had to mud the area where the bad spot was and I'm waiting for it to dry before I can completed.

Room 110 needed a second coat of paint. So, today I mudded a few spots on the walls, once it was dried I had to sand it and vacuum the dust off and then sealed it with primer sealer. I had to tape the wood trim to trim it out using a paint brush. Once the sealer was dried I painted the walls using the roller to complete the room.

At the end of the day I cleaned the roller and paint brush and rinsed the cleaning rags.

worked 8 hours,

Jeff













I had to file the back gates to get the rust off and smooth it down with the sand block. I wiped and cleaned it real good to get the dust off, so I could paint them. All gates are completed now.





The mother's room had a big crack and was tinged up from where the rocking chair bang against the wall. I had to mud the area where the bad spot was and I'm waiting for it to dry.









Room 110 needed a second coat of paint. So, today I mudded a few spots on the walls, once it was dried I had to sand it and vacuum the dust off and then sealed it with primer sealer. I had to tape the wood trim to trim it out using a paint brush. Once the sealer was dried I painted the walls using the roller to complete the room.

No comments:

Post a Comment