Tuesday, November 29, 2011

11.29.11 Fayetteville

On Tuesday I went to Fayetteville to do the following work orders in the building.

Jon and I went to Home Depot to purchase some supplies, so I would be able to do the work orders in the building.

FBJ33195 I had to remove the old inserts in the toilets out of both women's restrooms and put them back into the box for Jon to return them to Sloan. I had to replace and install the two new Sloan Flushmate inserts. I also had to switch the flush lever off the old insert to the new one. I had to take the water line off to remove the tank and remove 3 bolts off the back of the tank and then lift the back of the bowl off the toilet and change the gaskets and put everything back together. (completed)

FBJ30266 I had to re-attach the grill in the 2nd overflow of the cultural hall that was knocked loose. I repaired the bent areas on the vent to straighten it out and replaced it back on the wall. (completed)

FBJ33155 I had to readjust the door cylinders through the building in the primary room, cultural hall and the hallways for them to shut slower, so they would not shut too loudly. (completed)

The perimeter double doors to the side of the building was dragging and I had to adjust it so it would open and close properly.
I also sprayed all the perimeter door locks and hinges with WD40.

worked 8 hours,

Jeff














FBJ33195 I had to remove the old inserts in the toilets out of both women's restrooms and put them back into the box for Jon to return them to Sloan. I had to replace and install the two new Sloan Flushmate inserts. I also had to switch the flush lever off the old insert to the new one. I had to take the water line off to remove the tank and remove 3 bolts off the back of the tank and then lift the back of the bowl off the toilet and change the gaskets and put everything back together. (completed)







FBJ30266 I had to re-attach the grill in the 2nd overflow of the cultural hall that was knocked loose. I repaired the bent areas on the vent to straighten it out and replaced it back on the wall. (completed)












FBJ33155 I had to readjust the door cylinders through the building in the primary room, cultural hall and the hallways for them to shut slower, so they would not shut too loudly. (completed)





The perimeter double doors to the side of the building was dragging and I had to adjust it so it would open and close properly.