Tuesday, February 7, 2012

02.07.12 Buchanan

On Tuesday I went to Buchanan to do some trim work and painting in the building.

In the hallways I used a paint brush to trim around the exit signs and the cover on the backside of the exit signs. I also trimmed around several vents and the fluorescent lights. I had to take the covers off the lights to be able to do the touch up painting around them.

I trimmed around the frame on the wood work that goes around the stairs that folds down to go upstairs.

I did trim work with the paint brush all around the corners and edges of the hallways about 1 1/2 inches off the wall. I still have to re-mud one more spot tomorrow. After it dries I will sand it and use the roller to complete the painting.

worked 8 hours,

Jeff


















In the hallways I used a paint brush to trim around the exit signs and the cover on the backside of the exit signs. I also trimmed around several vents and the fluorescent lights. I had to take the covers off the lights to be able to do the touch up painting around them.








I did trim work with the paint brush all around the corners and edges of the hallways about 1 1/2 inches off the wall. I still have to re-mud one more spot tomorrow. After it dries I will sand it and use the roller to complete the painting.

No comments:

Post a Comment