Tuesday, February 28, 2012

02.28.12 Acworth

On Tuesday I went to the Acworth building to do the following work.

AL and I had to continue repairing the insulation in the attic that was dropped down and not good anymore. We had to move the ceiling tiles and several wires out of the way before we could get into the attic. I had to measure and cut the new insulation and hand it to Al in the attic. Al stayed in the attic to install the insulation where needed. We had to use a plug in extension light that I had to move around the rafters to see where the insulation needed to be installed. We had to put wire mesh on top of the insulation to secure it so it will not drop down again and we had to tack it on the rafters. After each section we had to replace the ceiling tiles back in the correct place. At the end of the day I vacuumed the insulation that had fell out of the attic.

Worked 12 hours,

Jeff




































AL and I had to continue repairing the insulation in the attic that was dropped down and not good anymore. We had to move the ceiling tiles and several wires out of the way before we could get into the attic. I had to measure and cut the new insulation and hand it to Al in the attic. Al stayed in the attic to install the insulation where needed. We had to use a plug in extension light that I had to move around the rafters to see where the insulation needed to be installed. We had to put wire mesh on top of the insulation to secure it so it will not drop down again and we had to tack it on the rafters. After each section we had to replace the ceiling tiles back in the correct place. At the end of the day I vacuumed the insulation that had fell out of the attic.

No comments:

Post a Comment