On Monday I went to Acworth to do the following work in and around the building.

AL and I had to repair the insulation in the attic that was dropped down and not good anymore. We had to move the ceiling tiles and several wires out of the way before we could get into the attic. I had to measure and cut the new insulation and hand it to Al in the attic. Al stayed in the attic to install the insulation where needed. We had to use a plug in extension light that I had to move around the rafters to see where the insulation needed to be installed. We had to put wire mesh on top of the insulation to secure it so it will not drop down again and we had to tack it on the rafters.

I had to clean the downspouts, sprinklers and the drain covers with a brush and solution soap. Then I painted them bronze paint to match the parking lot signs.

Worked 10 hours,

Jeff




























AL and I had to repair the insulation in the attic that was dropped down and not good anymore. We had to move the ceiling tiles and several wires out of the way before we could get into the attic. I had to measure and cut the new insulation and hand it to Al in the attic. Al stayed in the attic to install the insulation where needed. We had to use a plug in extension light that I had to move around the rafters to see where the insulation needed to be installed. We had to put wire mesh on top of the insulation to secure it so it will not drop again and we had to tack it on the rafters.



















I had to clean the downspouts, sprinklers and the drain covers with a brush and solution soap. Then I painted them bronze paint to match the parking lot signs.