Wednesday, February 15, 2012

02.15.12 Acworth

On Wednesday I went to the Acworth building to do the following maintenance.

I checked the exterior doors around the building and I had to adjust one of the strike plates for it to shut good and tighter. All other doors were closing properly.

There was a lens on one of the lights that needed to be changed in the font area. It was old and cracked, after I changed the lens I threw the old one in the dumpster.

In the men and women's shower in the font area I changed 6 light bulbs and cleaned the bugs out. I had to wash the lens out with soap and water.

I installed a few sign holders, one in the back entrance of the door and two on the side glass near the door at the main entrance of the building.

There was a table top all messed up, so I was asked to take the legs off and put them in the mechanical room, but throw the top away in the dumpster.

FBJ33191 I installed a new Sloan Flush Unit in the men's restroom. (completed)

In room 102 and 103 there was a loose light fixture in each room. I had to take the lens and the cover of the ballast off to get to the screws and nuts to tighten them back up and then I put the cover back on.

I had to clean the bugs out of the lights through out the building, in the hallways, classrooms, chapel and cultural hall. I found one burnt bulb in one of the classrooms that I had to replace with a new one.

Worked 9 hours,

Jeff








I checked the exterior doors around the building and I had to adjust one of the strike plates for it to shut good and tighter. All other doors were closing properly.






There was a lens on one of the lights that needed to be changed in the font area. It was old and cracked, after I changed the lens I threw the old one in the dumpster.

















In the men and women's shower in the font area I changed 6 light bulbs and cleaned the bugs out. I had to wash the lens out with soap and water.










I installed a few sign holders, one in the back entrance of the door and two on the side glass near the door at the main entrance of the building.





There was a table top all messed up, so I was asked to take the legs off and put them in the mechanical room, but throw the top away in the dumpster.






FBJ33191 I installed a new Sloan Flush Unit in the men's restroom. (completed)







In room 102 and 103 there was a loose light fixture in each room. I had to take the lens and the cover of the ballast off to get to the screws and nuts to tighten them back up and then I put the cover back on.








I had to clean the bugs out of the lights through out the building, in the hallways, classrooms, chapel and cultural hall. I found one burnt bulb in one of the classrooms that I had to replace with a new one.