I installed a few paper holds on the glass next to the entrance doors. I cleaned the glass real good and peeled off the paper on the backside of the holder and stuck it to the glass.
The cylinder on the door going into the cultural hall was extra loose, so I took the cover off and tightened the screws to the cylinder to the door. It is now shutting properly.
FBJ33178 (#3) I replaced 8 batteries (6 volt 12amp hrs) that were not working on the exterior emergency lights in the attic upstairs on the wall. I had to cut a few clips off the wire to replace them with new ones, that were ate up with battery acid. (completed)
FBJ33178 (#4) The two flood lights in the chapel were out, at the rostrum. I replaced them with new ones. (completed)
FBJ33408 I had to replace the fans in the men and women's restroom. I had to take the old fan out of the women's restroom and both cages were very dirty. I had to wash the men and women's cage out real good in the custodian room. I had to use the pig vacuum cleaner to vacuum the top of the boxes out where the motors goes, then I installed the new motor for the fans in both restrooms. (completed)
I noticed a cracked light switch cover in the cultural hall and one of the classrooms, so I replaced them with a new one.
Mike asked me to clean the light fixture in the foyer, so I used a ladder to reach it and I pulled out a stuffed penguin.
I cleaned out a few bugs too.
I had to replace two light bulbs in the hall way that didn't match the other light bulbs.
Worked 8 hours,
Jeff
I installed a few paper holds on the glass next to the entrance doors. I cleaned the glass real good and peeled off the paper on the backside of the holder and stuck it to the glass.
The cylinder on the door going into the cultural hall was extra loose, so I took the cover off and tightened the screws to the cylinder to the door. It is now shutting properly.
FBJ33178 (#3) I replaced 8 batteries (6 volt 12amp hrs) that were not working on the exterior emergency lights in the attic upstairs on the wall. I had to cut a few clips off the wire to replace them with new ones, that were ate up with battery acid. (completed)
FBJ33178 (#4) The two flood lights in the chapel were out, at the rostrum. I replaced them with new ones. (completed)
FBJ33408 I had to replace the fans in the men and women's restroom. I had to take the old fan out of the women's restroom and both cages were very dirty. I had to wash the men and women's cage out real good in the custodian room. I had to use the pig vacuum cleaner to vacuum the top of the boxes out where the motors goes, then I installed the new motor for the fans in both restrooms. (completed)
I noticed a cracked light switch cover in the cultural hall and one of the classrooms, so I replaced them with a new one.
Mike asked me to clean the light fixture in the foyer, so I used a ladder to reach it and I pulled out a stuffed penguin.
I cleaned out a few bugs too.
I had to replace two light bulbs in the hall way that didn't match the other light bulbs.