On Monday I went to Newnan to do the following work around the building.

I had to get a sample of paint color from the GA. Power electrical box and go to Home Depot to purchase the paint and a few rags to clean the box.

I had to paint and clean the GA. Power electrical box. First I had to scrape and file the rust off the edges, corners and top of the box. Then I used solution to scrub the whole box clean and rinsed it off. After it was dry I painted the top of it.

The gutters had leaks by the RS room. So, I had to wipe the seam to clean it, then I caulked with clear silicone caulking.

I cleaned all the exterior doors around the building with a spray can of wax and polish for medal doors.

Worked 8 hours,

Jeff














I had to paint and clean the GA. Power electrical box. First I had to scrape and file the rust off the edges, corners and top of the box. Then I used solution to scrub the whole box clean and rinsed it off. After it was dry I painted the top of it.







The gutters had leaks by the primary room. So, I had to wipe the seam to clean it, then I caulked with clear silicone caulking.














I cleaned all the exterior doors around the building with a spray can of wax and polish for medal doors.