Tuesday, May 3, 2011

05.03.11 Calhoun and Cartersville

On Tuesday I went to Calhoun and Cartersville to do the following work orders and maintenance work in the building.

I checked thermostat control and it was working properly blowing cool air.

FBJ29818 I checked the toilets in the family restroom and poured some liquid plumber into it and let it set all day. Before leaving for the day I flushed the toilet and it flushed with no problems. I also checked the plumbing in the other restroom and all was working properly. (completed)

FBJ29786 I verified the AC repairs due to storms, I listened to them run outside and it sounded good. (completed)

The light outside on the side of the church was not working. It had a loose connection on the wire and I repaired it and it is working properly.

Lubricated the pulpit control and checked the fuse, satellite and sound system and they are all working properly.

Checked the emergency light, hallway and chapel lights and they were all working good.

I stained some woodwork on the classroom and chapel doors that had some chips and scratches.

I checked the applianced in the kitchen, the stove, refrigerator and microwave and found no problems.

FBJ29819 I patched the wall in the font area by the women's restroom. I have to let it finish drying before I can sand and paint it. I will finish it the next time I go to the building.

I went to Cartersville to pick up some soap dispensers and liquid soap from the shed. As I go to other church buildings I will install them as needed.

Worked 8 hours

Jeff







I checked thermostat control and it was working properly blowing cool air.





FBJ29818 I checked the toilets in the family restroom and poured some liquid plumber into it and let it set all day. Before leaving for the day I flushed the toilet and it flushed with no problems. (completed)




FBJ29786 I verified the AC repairs due to storms, I listened to them run outside and it sounded good. (completed)





The light outside on the side of the church was not working. It had a loose connection on the wire and I repaired and it is working properly.





Lubricated the pulpit control and checked the fuse, satellite and sound system and they are all working properly.









Checked the emergency, hallway and chapel lights and they were all working good.






I stained some woodwork on the classroom and chapel doors.






I checked the applianced in the kitchen, the stove, refrigerator and microwave and found no problems.







FBJ29819 I patched the wall in font area by the women's restroom. I have to let it finish drying before I can sand and paint it.