On Monday I went to Acworth and did the following work orders and maintenance in the building.

I checked the thermostats through out the building and the only one that wasn't working properly was in the south side of the gym. I took it apart and checked for loose wires and could not get the green light to come on.

FBJ29981 I repaired the back door on the southside that was missing the handle and a few screws. I found the pieces that I needed in the clerks office and had get new screws to put all the parts back together for door to be fixed.

I checked the outlets and they all tested good.

I checked the changing tables and tightened the screws to the wall as needed.

I took a picture of the lawn and it looks like new mulch was put down.

FBJ29933 I had to tighten the gutters to the building that was loose and this should stop it from overflowing and washing the mulch. If the problems occurs again we may have to put a valley shield to keep it from overflowing again. (completed)

I checked the classroom tables and had to tighten the screws on the legs as needed.

I checked the lights in the chapel and cultural hall and they were all working properly.

I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounded good.

I touched up woodwork with stain on the interior doors throughout the building that had chips and scratches.

Worked 8 hours,

Jeff










I checked the thermostats through out the building and the only one that wasn't working properly was in the south side of the gym.








FBJ29981 I repaired the back door on the southside that was missing the handle and a few screws.





I checked the outlets and they all tested good.






I checked the changing tables and tightened the screws to the wall as needed.





I took a picture of the lawn and it looks like new mulch was put down.







FBJ29933 I had to tighten the gutters to the building that was loose and this should stop it from overflowing and washing the mulch. (completed)







I checked the classroom tables and had to tighten the screws on the legs as needed.







I checked the lights in the chapel and cultural hall and they were all working properly.





I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel and all sounded good.










I touched up woodwork with stain on the interior doors throughout the building that had chips and scratches.