A couple of pickets were out of the fence in the back of the church and I had to put them back into the fence.
I notice the rubber part of the doorstop was missing down the hallway and I had to screw it back on the wall.
The outlet cover was busted on the stage and I had to replace it with a new one.
FBJ29792 Ms. Mary asked me to take a picture to show her where the damage was on the stage curtain. The top of the curtain is torn about 10 inches and the other one is torn at the bottom.
The curtain rod was bent and I had to straighten it out and push the anchor back and screw it into the wall in the RS room.
I tightened the screws on the legs of the classroom tables as needed through out the building.
FBJ29929 The gutter overflow guard was causing the soil and mulch to wash away, so I had to bend it inward toward the gutter to stop the water from overflowing the gutter, this should solve the problem. If this doesn't work we will have to get bigger overflow guards. (completed)
I checked the changing tables and tightened the screws as needed to the walls.
The arm was broke off the blue chair and I had to glue it, screw it and nailed it back together in the high council room.
I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, and they were working properly.
I had to change a spot light in the chapel that was burnt. All other lights in the chapel and cultural hall are working properly.
The outlets in the building all tested good.
I checked all the vacuum cleaners and lubricated the barrens and rollers. They are all running good.
I checked the appliances in the kitchen, the refrigerator, microwave and stove and all were working properly.
I check the thermostat controls through out the building and they were working properly with cool air.
worked 8 hours,
Jeff
A couple of pickets were out of the fence and I had to put them back into the fence.
I notice the rubber part of the doorstop was missing and I had to screw it back on the wall.
The outlet cover was busted on the stage and I had to replace it with a new one.
FBJ29792 Ms. Mary asked me to take a picture to show her where the damage was on the stage curtain. The top of the curtain is torn about 10 inches and the other one is torn at the bottom.
The curtain rod was bent and I had to straighten it out and push the anchor back and screw it into the wall.
I tightened the screws on the legs of the classroom tables as needed through out the building.
FBJ29929 The gutter overflow guard was causing the soil and mulch to wash away, so I had to bend it inward toward the gutter to stop the water from overflowing the gutter, this should solve the problem. If this doesn't work we will have to get bigger overflow guards. (completed)
I checked the changing tables and tightened the screws as needed to the walls.
The arm was broke off the chair and I had to glue it, screw it and nailed it back together.
I lubricated the pulpit control and checked the fuse, satellite and sound system in the chapel, and they were working properly.
I had to change a spot light in the chapel. All other lights in the chapel and cultural hall are working properly.
The outlets in the building all tested good.
I checked all the vacuum cleaners and lubricated the barrens and rollers. They are all running good.
I checked the appliances in the kitchen, the refrigerator, microwave and stove and all were working properly.
I check the thermostat controls through out the building and they were working properly with cool air.