On Thursday I went to Cedartown and Buhanan to do the following work orders and maintenance in the building.

I checked the thermostat controls in the building and they all were working properly with heat.

FBJ29931 I tightened the screws on the gutters tighter to the building and hopefully that will help, if not we may have to revisit and try something else. I think maybe when it rained real hard it may cause the overflow to occur. (completed)

FBJ29862 I verified the mulch was done - Southern Yard. (completed)

The outlets in the Cedartown building all tested good.

FBJ29825 This is the bush that was planted last year in Cedartown and I don't know why it died.

I touched up some woodwork with stain that was needed around the building that was chipped and had scratches.

I tightened the screws on the legs of the classroom tables as needed through out the building.

The lights in the chapel and cultural hall were all good, no burnt lights were found.

I lubricated the pulpit control and checked the fuse, satellite and sound system and all sounded good.

The appliances in the kitchen, the stove, microwave, refrigerator and dishwasher were all working good.

FBJ29926 This is where the lawn is very thin at the Buchanan building and needs to be over seeded for it to get thicker over time.

FBJ29861 I verified the mulch was done at the Buchanan building - Southern Yard. (completed)

The lights at the Buchanan chapel and cultural hall were all lit, no problems were found.

FBJ29843 I helped James readjust the satellite and also put in a new receiver for the satellite to work properly in the chapel.

worked 8 hours,

Jeff








I checked the thermostat controls in the building and they all were working properly with heat.




FBJ29931 I tightened the screws on the gutters tighter to the building and hopefully that will help, if not we may have to revisit and try something else. (completed)




FBJ29862 I verified the mulch was done - Southern Yard. (completed)





The outlets in the Cedartown building all tested good.





FBJ29825 This is the bush that was planted last year and I don't know why it died.








I touched up some woodwork with stain that was needed around the building that was chipped and had scratches.





I tightened the screws on the legs of the classroom tables as needed through out the building.






The lights in the chapel and cultural hall were all good, no burnt lights were found.






I lubricated the pulpit control and checked the fuse, satellite and sound system and all sounded good.







The appliances in the kitchen, the stove, microwave, refrigerator and dishwasher were all working good.




FBJ29926 This is where the lawn is very thin at the Buchanan building and needs to be over seeded for it to get thicker over time.




FBJ29861 I verified the mulch was done at the Buchanan building - Southern Yard. (completed)




The lights at the Buchanan chapel and cultural hall were all lit, no problems were found.






FBJ29843 I helped James readjust the satellite and also put in a new receiver for the satellite to work properly in the chapel.