I checked the thermostat controls in the building and all were working properly with heat.
I notice there was four holes in the tiles in the men's restroom and I repaired them with putty.
I found an outlet without a cover in the closet by the Bishop's office and I put a new cover on it.
The formica strip was off the edge of the end table and I had to glue it back on, by the Bishop's office.
I checked the lights and the heating unit in the attic and everything is working properly.
I had to put a new screw in the strike plate to tighten it for the door to close properly. All other doors were opening and closing properly.
The lights in the chapel and cultural hall were all working properly.
FBJ29867 I verified that the mulch was done in the front of the church. (completed)
FBJ29787 The humming noise came from the super cardioid microphone control. There was 2 wires loose not making a good connection that caused it to hum. I had to tightened the 2 wires and the speakers sound is now clear. I lubricated the pulpit control and checked the fuse, satellite and sound system and all is working and sounding properly. (completed)
FBJ29804 I installed 7 new soap dispensers through out the building in the women, men and family restrooms and also in the kitchen and the sacrament prep room. I had to pull off the old dispensers and scrap and clean the old glue off the wall before installing the new ones. I threw all the old ones away into the dumpster. (completed)
I stained some woodwork on a few doors through out the church that had chips and scratches.
worked 8 hours
Jeff
I checked the thermostat controls in the building and all were working properly with heat.
I notice there was four holes in the tiles in the men's restroom and I repaired them with putty.
I found an outlet without a cover in the closet by the Bishop's office and I put a new cover on it.
The formica strip was off the edge of the end table and I had to glue it back on, by the Bishop's office.
I checked the lights and the heating unit in the attic and everything is working properly.
I had to put a new screw in the strike plate to tighten it for the door to close properly. All other doors were opening and closing properly.
The lights in the chapel and cultural hall were all working properly.
FBJ29867 I verified that the mulch was done in the front of the church. (completed)
FBJ29787 The humming noise came from the super cardioid microphone control. There was 2 wires loose not making a good connection that caused it to hum. I had to tightened the 2 wires and the speakers sound is now clear. (completed)
FBJ29804 I installed 7 new soap dispensers through out the building in the women, men and family restrooms and also in the kitchen and the sacrament prep room. (completed)
I stained some woodwork on a few doors through out the church that had chips and scratches.